Before the team arrives
Clear the area around the gate, keep access for the team and make sure power is available. Park vehicles where the gate will not be blocked.
During installation
The team fits the operator, rack or arms, controller and safety devices, sets the travel limits and runs cables. Some civil work such as a base plate may be needed first.
Testing and handover
The team tests every remote and safety device, checks the manual release and shows you how to operate the system. Ask for written contact details for service and confirm what is covered.
